NASA’s Dragonfly to Proceed with Final Mission Design Work

NASA’s Dragonfly mission has been authorized to proceed with work on final mission design and fabrication – known as Phase C – during fiscal year (FY) 2024. The agency is postponing formal confirmation of the mission (including its total cost and schedule) until mid-2024, following the release of the FY 2025 President’s Budget Request. Earlier […]
Posted on November 28, 2023
Sign up for our newsletter:

Categories

1
5
36
6
1
80
2
3
1
2
1
5
1
10
13
3
2
27
558
2
1
4
1
1
113
1
1
187
2
11
3
Io
3
2
1
12
1
6
301
1
1
10
3
4
164
3
1
1
1
3
41
49
203
2
28
2
5
6
4
7
1
4
20
249
1
4
10
2
16
17
1
35
10
6
1

Blog Posts

Newsletter Archive