NASA’s Dragonfly to Proceed with Final Mission Design Work

NASA’s Dragonfly mission has been authorized to proceed with work on final mission design and fabrication – known as Phase C – during fiscal year (FY) 2024. The agency is postponing formal confirmation of the mission (including its total cost and schedule) until mid-2024, following the release of the FY 2025 President’s Budget Request. Earlier […]
Posted on November 28, 2023
Sign up for our newsletter:

Categories

Io
4
3
1
14
29
12
43
1
6
5
2
1
13
6
1
3
260
10
1
2
220
1
7
1
10
10
1
10
1
4
344
624
3
1
1
58
1
29
1
1
2
10
1
52
24
193
1
6
1
365
14
3
3
147
1
4
12
18
4
1
1
1
2
4
18
2
196
37
12
1
6
11
17
2
103
4
10
2
6
2
3

Blog Posts

Newsletter Archive