NASA’s Dragonfly to Proceed with Final Mission Design Work

NASA’s Dragonfly mission has been authorized to proceed with work on final mission design and fabrication – known as Phase C – during fiscal year (FY) 2024. The agency is postponing formal confirmation of the mission (including its total cost and schedule) until mid-2024, following the release of the FY 2025 President’s Budget Request. Earlier […]
Posted on November 28, 2023
Sign up for our newsletter:

Categories

17
1
386
10
4
159
Io
5
1
13
6
27
113
14
9
1
1
4
14
1
202
6
661
1
6
1
1
17
2
2
3
11
10
1
29
2
6
4
51
1
14
210
30
14
46
1
2
7
3
3
10
1
1
4
2
20
3
1
3
1
3
1
1
7
17
233
6
13
1
361
1
21
1
1
3
13
3
1
38
67
280
5
10
62
2

Blog Posts

Newsletter Archive