NASA’s Dragonfly to Proceed with Final Mission Design Work

NASA’s Dragonfly mission has been authorized to proceed with work on final mission design and fabrication – known as Phase C – during fiscal year (FY) 2024. The agency is postponing formal confirmation of the mission (including its total cost and schedule) until mid-2024, following the release of the FY 2025 President’s Budget Request. Earlier […]
Posted on November 28, 2023
Sign up for our newsletter:

Categories

1
155
1
270
10
10
10
5
1
226
8
1
10
14
1
30
2
45
2
4
640
10
3
2
1
29
2
1
1
1
7
3
377
1
6
1
203
1
6
17
353
1
3
1
1
1
198
1
4
6
13
1
18
2
21
55
2
11
2
1
62
10
38
4
14
25
17
2
3
110
4
14
13
3
3
1
13
12
1
5
5
Io
5
6

Blog Posts

Newsletter Archive