NASA’s Dragonfly to Proceed with Final Mission Design Work

NASA’s Dragonfly mission has been authorized to proceed with work on final mission design and fabrication – known as Phase C – during fiscal year (FY) 2024. The agency is postponing formal confirmation of the mission (including its total cost and schedule) until mid-2024, following the release of the FY 2025 President’s Budget Request. Earlier […]
Posted on November 28, 2023
Sign up for our newsletter:

Categories

4
12
5
1
2
185
2
10
2
2
16
1
1
6
10
6
159
Io
3
1
12
3
530
1
1
7
1
3
1
1
103
1
3
1
41
1
3
9
4
1
4
38
15
1
2
4
65
5
34
227
2
4
10
1
1
145
293
1
6
1
2
6
3
1
31
2
1
1
27
21
17

Blog Posts

Newsletter Archive