NASA’s Dragonfly mission has been authorized to proceed with work on final mission design and fabrication – known as Phase C – during fiscal year (FY) 2024. The agency is postponing formal confirmation of the mission (including its total cost and schedule) until mid-2024, following the release of the FY 2025 President’s Budget Request. Earlier […]
Category:
Dragonfly, Planetary Science, Planetary Science Division, Saturn, Science & Research, Science Mission Directorate, The Solar System
Posted on
November 28, 2023
Sign up for our newsletter:
Categories
2
5
3
18
5
3
17
9
150
1
586
1
28
9
4
36
5
3
1
4
319
2
1
347
1
287
6
1
6
39
1
1
1
4
1
2
42
1
14
2
25
1
222
125
30
23
3
32
1
99
183
10
10
2
132
6
1
1
49
129
10
8
2
29
1
4
2
1
3
22
4
2
1
131
34
1
4
1
1
28
19
1
1
4
2
15
5
1
15
5
14
5
8
2
27
22
1
193
145
1
15
1
94
79
40
97
2
2
15
1
24
10
3
87
2
1
6
10
1
52
143
51
14
17
17
41
1
40
12
2
10
2
28
10
1
202
5
10
324
11
6
1
1
1
1
3
1
274
2
316
3
6
61
1
3
1
1
6
2
4
3
1
11
1
1
1
13
1
2
