STS-96

NASA History
STS-96
On May 27, 1999, the second space station assembly and logistics mission began. The main goals of STS-96, designated as the 2A.1 mission in the overall assembly sequence, included resupplying and repairing the fledgling orbital facility, consisting of the Zarya and Node 1 modules assembled during STS-88 in December 1998.
Posted May 29, 2024
Sign up for our newsletter:

Categories

1
29
1
10
3
2
185
10
43
18
2
210
1
12
4
2
37
1
1
3
1
2
1
1
2
1
18
25
135
9
1
6
Io
4
9
14
4
1
302
3
6
1
2
3
1
326
12
1
5
48
147
1
9
6
10
2
6
1
1
3
7
2
1
7
598
2
9
4
6
30
4
14
1
55
90
1
235
1
13
10
1
3

Recent Posts

Newsletter Archive