STS-96

NASA History
STS-96
On May 27, 1999, the second space station assembly and logistics mission began. The main goals of STS-96, designated as the 2A.1 mission in the overall assembly sequence, included resupplying and repairing the fledgling orbital facility, consisting of the Zarya and Node 1 modules assembled during STS-88 in December 1998.
Posted May 29, 2024
Sign up for our newsletter:

Categories

30
2
380
4
642
45
2
2
10
6
17
1
2
1
198
7
3
1
29
1
6
1
6
1
203
354
1
2
1
3
2
1
11
1
17
1
1
4
14
13
18
2
57
14
21
3
1
3
13
63
4
38
6
17
2
25
3
110
4
13
1
5
271
12
227
1
5
6
Io
5
1
10
1
1
155
10
10
10
3
1
8
14
1
1

Recent Posts

Newsletter Archive