STS-96

NASA History
STS-96
On May 27, 1999, the second space station assembly and logistics mission began. The main goals of STS-96, designated as the 2A.1 mission in the overall assembly sequence, included resupplying and repairing the fledgling orbital facility, consisting of the Zarya and Node 1 modules assembled during STS-88 in December 1998.
Posted May 29, 2024
Sign up for our newsletter:

Categories

13
63
4
38
6
2
25
17
3
110
4
13
1
5
271
12
227
1
5
6
Io
5
1
10
1
1
155
10
10
10
3
1
8
14
1
1
30
2
380
45
2
4
642
10
2
6
17
2
1
1
7
3
1
29
198
1
6
6
1
203
1
354
1
3
2
1
11
2
1
1
18
1
4
14
13
1
18
2
14
21
3
57
1
3

Recent Posts

Newsletter Archive