NASA’s Lunar Reconnaissance Orbiter Camera (LROC) imaged the landing area of the ispace SMBC x HAKUTO-R Venture Moon Mission 2 RESILIENCE lunar lander which is slated to land on the surface of the Moon no earlier than June 5, 2025 (UTC). This view of the primary landing area is 3.13 miles (5,040 meters) wide and north is up. […]
Posted on
May 16, 2025
Sign up for our newsletter:
Categories
1
1
1
131
6
18
32
17
1
2
42
206
1
10
149
3
378
3
1
4
1
1
2
10
25
31
64
37
18
1
18
84
1
25
41
10
20
15
29
6
2
1
353
4
43
1
42
1
2
14
105
153
6
1
1
17
100
1
1
3
38
4
101
57
1
10
2
3
3
193
134
1
1
10
9
3
1
11
37
23
2
11
5
6
10
1
5
1
41
5
9
2
331
2
4
2
1
20
1
25
1
1
337
12
1
3
1
106
1
2
14
1
7
51
616
10
12
4
13
6
1
23
24
288
141
2
2
18
1
2
3
52
31
1
1
3
1
254
117
1
10
1
1
6
13
342
15
1
4
10
216
12
2
1
11
1
29
30
15
4
188
1
166
1
9
1
4
2
1
6
95
2
8
3
50
15
1
3
2
14
3
Blog Posts
Rise Goes to Washington
May 13, 2026
NASA Outlines Preliminary Artemis III Mission Plans
May 13, 2026
