Technicians with NASA and Lockheed Martin fitted three spacecraft adapter jettison fairing panels onto the service module of the agency’s Orion’s spacecraft. The operation completed on Wednesday, March 19, 2025, inside the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida. The European-built service module is the powerhouse that will […]
Category:
Artemis 2, Christina H. Koch, G. Reid Wiseman, Kennedy Space Center, Orion Multi-Purpose Crew Vehicle, Space Launch System (SLS), Victor J. Glover
Posted on
March 21, 2025
Sign up for our newsletter:
Categories
33
17
46
69
1
67
36
386
3
299
107
11
1
48
3
105
4
113
34
1
7
2
17
27
10
6
18
4
1
45
41
1
55
37
6
13
14
2
1
371
3
1
12
202
15
8
5
1
1
10
11
3
18
1
6
6
3
46
1
3
10
2
10
1
101
152
1
3
2
11
10
2
1
21
407
11
1
30
13
18
3
17
1
13
114
6
3
661
2
53
38
2
29
14
46
1
4
6
30
35
3
1
1
2
4
187
1
14
2
1
1
1
3
1
1
17
5
159
29
281
133
7
388
10
2
2
10
1
2
5
210
14
1
18
1
3
3
1
58
22
1
54
136
3
8
1
1
11
362
1
14
1
41
10
19
9
233
1
13
141
1
2
1
95
1
4
1
46
1
26
4
2
1
19
13
20
3
222
21
6
1
170
3
2
7
62
112
6
1
1
Blog Posts
APOD: 2026 September 26 – Mirrored Meteor and Milky Way
September 26, 2026
NASA, Boeing to Provide Update on Starliner Development
September 26, 2026
NASA Welcomes San Marino Signing the Artemis Accords
September 25, 2026
